A rendered image of the custom home being built near Roseburg, Oregon.
Here are three pictures of
the view from the home site:
The site being prepared:
The first floor basement being built:
The post and beams are being set: note the protective wrapping
The roof sheathing is now on:
Radiant Floor Heat next week, then drywall!
Radiant Floor Heating tubing is being laid down.
Deck and rails are almost complete.
Back of the house with a small deck off to the side and steps being placed at the back door.
Master bathroom is being prepared to start the tile and glass blocking in the shower stall.
Skylights and beams in the great room.
Kitchen cabinets are being installed. The floor has been sealed to start laying the tile floor.
The doors that lead from the two car garage into the basement floor and upstairs.
Radiant Floor Heating System is installed and running.
Master Bathroom with tiled shower stall. Time to move in!
First winter in the new home.